logo

Hickory Creek Wind - 600 MW

Sector: Wind • Location: Oklahoma, United States of America

Source: Dodge USA

Project
Planning Schematics

600 MW wind facility, enough to power around 218,000 homes, on approximately a 45,000 acre site, in a north-central part of Nowata County. AEP/PSO operates the Oologah Power Plant, and the coal portion of the plant is targeted to shutter by Jan. 2026. Hickory Creek Wind would utilize the current grid infrastructure. Would tap the Lenapah to Oologah Line. 2nd Interconnection at Watova substation fo

Status
Prospective
Sector
Wind, Power Transmission, Residential, Power Generation (CCGT), Commercial
Location
Oklahoma, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Hickory Creek Wind - 600 MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hickory Creek Wind - 600 MW” is an infrastructure initiative in the Wind sector, located in Oklahoma, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

600 MW wind facility, enough to power around 218,000 homes, on approximately a 45,000 acre site, in a north-central part of Nowata County. AEP/PSO operates the Oologah Power Plant, and the coal portion of the plant is targeted to shutter by Jan. 2026. Hickory Creek Wind would utilize the current grid infrastructure. Would tap the Lenapah to Oologah Line. 2nd Interconnection at Watova substation for the option of a standard SPP interconnection.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oklahoma

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Wind, Power Transmission, Residential, Power Generation (CCGT), Commercial

Article published date

2024-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project