Hidalgo Photovoltaic Projects
Sector: Power Generation (CCGT) • Location: Hidalgo, Mexico
Source: Renewable Energy Magazine
Dhamma Energy Mexico was awarded 440 MW of nominal photovoltaic capacity for the development of three adjacent PV projects named Hidalgo 1, Hidalgo 2, and Hidalgo 3 in the state of Hidalgo, Mexico. These projects will be connected to a single interconnection point to optimize integration into Mexico's National Power System, with a commercial operation date scheduled between June and December 2028.
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar, Government, Commercial
- Location
- Hidalgo, Mexico
- Updated
- 22 Jul 2026
- Source
- Renewable Energy Magazine
ConstructChat
Ask ConstructChat about Hidalgo Photovoltaic Projects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Dhamma Energy Mexico was awarded 440 MW of nominal photovoltaic capacity for the development of three adjacent PV projects named Hidalgo 1, Hidalgo 2, and Hidalgo 3 in the state of Hidalgo, Mexico. These projects will be connected to a single interconnection point to optimize integration into Mexico's National Power System, with a commercial operation date scheduled between June and December 2028. |
Original sector | Energy |
Location
Country | Mexico |
State | Hidalgo |
Source
Source | Renewable Energy Magazine |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Government, Commercial |
Article published date | 2025-12-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
