logo

Hidden Beach Restroom - Site Work

Sector: Water Supply and Storage • Location: Aptos, California, United States of America

Source: Dodge USA

Project
Closed

Phase One - Preparing the site for prefab restroom installation: Site clearing, demolition and excavation; provide all utilities located 6 outside the building perimeter; contractor to coordinate utility connection with PG&E installation of a finished slab with elevation for the prefabricated building; provide survey for building pad and prefabricated building slab elevation and front corners, pro

Status
Closed
Sector
Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Commercial, Waste Processing and Treatment
Location
Aptos, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Hidden Beach Restroom - Site Work

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hidden Beach Restroom - Site Work” is an infrastructure initiative in the Water Supply and Storage sector, located in Aptos, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase One - Preparing the site for prefab restroom installation: Site clearing, demolition and excavation; provide all utilities located 6 outside the building perimeter; contractor to coordinate utility connection with PG&E installation of a finished slab with elevation for the prefabricated building; provide survey for building pad and prefabricated building slab elevation and front corners, provide building front corner stakes with a 10 offset; provide any trench plates necessary for the c...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Aptos

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Commercial, Waste Processing and Treatment

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project