Hidden Hills Townhouse Ph 2 & 3
Sector: Water Supply and Storage • Location: Medford, Oregon, United States of America
Source: Dodge
Phases 2 and 3 of Hidden Hills Subdivision, a proposed 39-lot (Lots 12 50) residential subdivision. Lots 12 38 are proposed as standard lots, and Lots 39 50 are proposed as townhouse lots. The property is located on two parcels totaling approximately 8.36 acres and located south of Delta Waters Road and west of North Foothill Road
- Status
- Failure
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Residential, Commercial
- Location
- Medford, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hidden Hills Townhouse Ph 2 & 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phases 2 and 3 of Hidden Hills Subdivision, a proposed 39-lot (Lots 12 50) residential subdivision. Lots 12 38 are proposed as standard lots, and Lots 39 50 are proposed as townhouse lots. The property is located on two parcels totaling approximately 8.36 acres and located south of Delta Waters Road and west of North Foothill Road |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Medford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Residential, Commercial |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
