Hidden Marina
Under construction · Saudi Arabia · Last reported Feb 2025
Source: Dezeen
Neom began construction on the Hidden Marina, the first segment of The Line in Saudi Arabia. The 2.5-kilometre-long, 500-metres-high segment features a man-made marina, a stadium for the 2034 World Cup 350 metres above the ground, a 30-storey office building hanging upside-down, and accommodation for more than 200,000 people. A feasibility review is underway due to reported difficulties.
- Status
- Under Construction
- Sector
- Seaport, Stadium, Residential, Commercial
- Location
- Neom, Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- Dezeen
ConstructChat
Ask ConstructChat about Hidden Marina
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Neom began construction on the Hidden Marina, the first segment of The Line in Saudi Arabia. The 2.5-kilometre-long, 500-metres-high segment features a man-made marina, a stadium for the 2034 World Cup 350 metres above the ground, a 30-storey office building hanging upside-down, and accommodation for more than 200,000 people. A feasibility review is underway due to reported difficulties. |
Original sector | Architecture |
Location
Country | Saudi Arabia |
City | Neom |
Source
Source | Dezeen |
URL |
More Details
Record type | Project |
Sector | Seaport, Stadium, Residential, Commercial |
Article published date | 2025-12-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
