Hiddleston Park Playground Redevelopment
Closed · Manitoba · Last reported Feb 2023
Source: Dodge USA
The Work to be done under the Contract shall consist of the removal and replacement of existing play equipment, site furniture and pathways. D2.2 The major components of the Work are as follows: (a) Removals; (b) Excavation and site grading; (c) Timber play edging; (d) Play equipment and swings; (e) Engineered wood fibre safety surfacing and drainage system; (f) Granular pathway; (g) Site furnitur
- Status
- Closed
- Sector
- Forest Products and Packaging, Car parking, Government, Automotive, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Winnipeg, Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hiddleston Park Playground Redevelopment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work to be done under the Contract shall consist of the removal and replacement of existing play equipment, site furniture and pathways. D2.2 The major components of the Work are as follows: (a) Removals; (b) Excavation and site grading; (c) Timber play edging; (d) Play equipment and swings; (e) Engineered wood fibre safety surfacing and drainage system; (f) Granular pathway; (g) Site furniture; and (h) Soil and sod |
Procurement method | |
Budget |
Location
Country | Canada |
State | Manitoba |
City | Winnipeg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Car parking, Government, Automotive, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in Canada
- Evanston Centre
- Woodfibre LNG Project, British Columbia
- Aga Khan Museum + Ismaili Centre
- 728 Yonge
- Children's and Women's Clinical Support Building
- Thorold Cogeneration Project Ontario Canada
- Surrey Biofuel Processing Facility Project
- Surrey Memorial Hospital Redevelopment and Expansion: Emergency Department and Critical Care Tower
