HI/DOT: Anini Bridge No. 2 Replacement
One of 8,718 projects Taiyo tracks in Hawaii.
Source: Dodge USA
Anini Bridge #2 Replacement . Estimated Total Project Cost - $4,000,000 -- Replace existing double box culvert and temporary one-lane precast panel bridge with a new structure. Demolish existing bridge, construct temporary bypass bridge, construct new two-lane bridge and possibly paved shoulders; relolcate utilities.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Bridge, Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT)
- Location
- Kilauea, Hawaii, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about HI/DOT: Anini Bridge No. 2 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Anini Bridge #2 Replacement . Estimated Total Project Cost - $4,000,000 -- Replace existing double box culvert and temporary one-lane precast panel bridge with a new structure. Demolish existing bridge, construct temporary bypass bridge, construct new two-lane bridge and possibly paved shoulders; relolcate utilities. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Kilauea |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Bridge, Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
