HI/DOT: Freeway Management System Improvements PH 4
Sector: Broadband • Location: Aiea, Hawaii, United States of America
Source: Dodge
The project includes the replacement of CCTV cameras along the H-3 Freeway and within the Tetsuo Harano Tunnel, installation and replacement of the corridor wide fiber optic trunk communications cable, installation of new CCTV cameras on H-3 Freeway and operator equipment upgrades at the Tetsuo Harano Tunnel traffic operations center. The project also includes the installation of new CCTV cameras
- Status
- Prospective
- Sector
- Broadband, Road, Bridge, Commercial, Telecommunications, Tunnel
- Location
- Aiea, Hawaii, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about HI/DOT: Freeway Management System Improvements PH 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the replacement of CCTV cameras along the H-3 Freeway and within the Tetsuo Harano Tunnel, installation and replacement of the corridor wide fiber optic trunk communications cable, installation of new CCTV cameras on H-3 Freeway and operator equipment upgrades at the Tetsuo Harano Tunnel traffic operations center. The project also includes the installation of new CCTV cameras on Pali Highway with limited conduit installation at camera sites and the installation of fiber o... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Aiea |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Broadband, Road, Bridge, Commercial, Telecommunications, Tunnel |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
