logo

HI/DOT: H-1 Highway Lighting Improvements Phase 1

Sector: Tunnel • Location: Aiea, Hawaii, United States of America

Source: Dodge USA

Project
Bidding

The scope of work consists of upgrading the highway lighting system on Interstate Route H-1, between Aiea Heights Drive (M.P. 12.83) and Elliott Street (M.P. 16.00) to meet current AASHTO, State, and Federal standards. Associated highway lighting work includes the replacement of existing pole mounted streetlights with new LED based streetlights including providing a new pole, pole base, and founda

Status
Prospective
Sector
Tunnel, Power Generation (CCGT), Road, Commercial
Location
Aiea, Hawaii, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about HI/DOT: H-1 Highway Lighting Improvements Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “HI/DOT: H-1 Highway Lighting Improvements Phase 1” is an infrastructure initiative in the Tunnel sector, located in Aiea, Hawaii, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of work consists of upgrading the highway lighting system on Interstate Route H-1, between Aiea Heights Drive (M.P. 12.83) and Elliott Street (M.P. 16.00) to meet current AASHTO, State, and Federal standards. Associated highway lighting work includes the replacement of existing pole mounted streetlights with new LED based streetlights including providing a new pole, pole base, and foundation, existing underpass lights with new LED based NTB-2 lights, electrical panels and cabinets, ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Hawaii

City

Aiea

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Tunnel, Power Generation (CCGT), Road, Commercial

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project