HI/DOT: Lighting Improvements
One of 8,718 projects Taiyo tracks in Hawaii.
Source: Dodge
The scope of work generally involves the removal of seven (7) high mast light poles and foundations, the replacement of one (1) high mast light pole and foundation, the upgrade of eleven (11) high mast light poles with new LED luminaires, the relocation of an existing fire hydrant, and the relocation of Young Brothers power and telecommunication utilities servicing their container station at Pier
- Status
- Closed
- Sector
- Telecommunications, Road, Power Transmission, Power Generation (CCGT), Commercial, Seaport
- Location
- Hilo, Hawaii, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about HI/DOT: Lighting Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work generally involves the removal of seven (7) high mast light poles and foundations, the replacement of one (1) high mast light pole and foundation, the upgrade of eleven (11) high mast light poles with new LED luminaires, the relocation of an existing fire hydrant, and the relocation of Young Brothers power and telecommunication utilities servicing their container station at Pier 4. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Hilo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Road, Power Transmission, Power Generation (CCGT), Commercial, Seaport |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
