HI/DOT: Transit Statewide Planning
Sector: Commercial • Location: Waimea, Hawaii, United States of America
Source: Dodge USA
S28 Statewide Planning PLN 150 120 30 156 125 31 161 129 32 166 133 33 171 137 34 176 141 35 FTA SECTION 5304 Estimated Total Project Cost - $995,000 -- FTA Statewide Planning (Section 5304). Funds will be utilized for short range transit plans and civil rights studies
- Status
- Prospective
- Sector
- Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Waimea, Hawaii, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about HI/DOT: Transit Statewide Planning
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | S28 Statewide Planning PLN 150 120 30 156 125 31 161 129 32 166 133 33 171 137 34 176 141 35 FTA SECTION 5304 Estimated Total Project Cost - $995,000 -- FTA Statewide Planning (Section 5304). Funds will be utilized for short range transit plans and civil rights studies |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Waimea |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
