HI/DOT: West Maui Greenway Improvements
Sector: Road • Location: Honolulu, Hawaii, United States of America
Source: Dodge
Estimated Total Project Cost - $13,000,000 -- The West Maui Greenway is a 25-mile multi-use trail that will one day connect Ukumehame to Lipoa Point. When complete, the greenway will provide safe and welcoming recreation and transportation opportunities for the community, separated from traffic along Honoapi ilani Highway. Design guidelines from the West Maui Greenway Master Plan identify differen
- Status
- Prospective
- Sector
- Road, Car parking, Automotive, Commercial
- Location
- Honolulu, Hawaii, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about HI/DOT: West Maui Greenway Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Estimated Total Project Cost - $13,000,000 -- The West Maui Greenway is a 25-mile multi-use trail that will one day connect Ukumehame to Lipoa Point. When complete, the greenway will provide safe and welcoming recreation and transportation opportunities for the community, separated from traffic along Honoapi ilani Highway. Design guidelines from the West Maui Greenway Master Plan identify different trail typologies based on land use context. At a minimum, the greenway will include an 12-foot ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Honolulu |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Car parking, Automotive, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
