logo

Hidroelectric power station La Muela II

Sector: Cement • Location: Spain

Source: FCC Construction

Project
Closed

The works are located on the right bank of the River Júcar in the Municipal Terminus of Cortes de Pallás, in Valencia.The project consisted of the execution of the excavation, support and concreting of the various caverns, shafts, galleries and foundations for the La Muela II hydroelectric power station construction. The central cavern has a dome that is 117 metres long, 19.85 metres wide and 50 m

Project Information FAQ

Project Information

3 Q
The project “Hidroelectric power station La Muela II” is an infrastructure initiative in the Cement sector, located in Spain. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The works are located on the right bank of the River Júcar in the Municipal Terminus of Cortes de Pallás, in Valencia.The project consisted of the execution of the excavation, support and concreting of the various caverns, shafts, galleries and foundations for the La Muela II hydroelectric power station construction. The central cavern has a dome that is 117 metres long, 19.85 metres wide and 50 metres high constructed with reinforced concrete and organised into three main floors: The access floor, the alternator floor and the turbine floor.The area containing the transformers was constructed in the same way, but with dimensions of 81 x 19 and 20 x 18 metres.The communicating gallery between the power stations joins La Muela I and II and consists of two galleries that are intersected by an orthogonal crossing.The aspiration system is made up of four 3.50-metre diameter galleries that are lined with reinforced concrete.The connection between the drainage shafts for both power stations is 142 metres long.The 20 kV service gallery connects the power station access tunnel to the cable shaft. It is 67 metres long, 4.5 metres wide and 5.50 metres high.The piping and cable gallery crosses the transformer cavern at its lowest elevation and on the left, communicates with the central cavern and on the right, with the access gallery to the aspiration conduits.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data