Hidroelectrica Boliviana (Central Taquesi)
Sector: Water Supply and Storage • Location: Bolivia
Source: World Bank Group
The project is located about 40 kilometers east of La Paz on the Taquesi River and consists of two new run-of-river hydroelectric power plants in cascade (85 MW) and an existing refurbished 850-kW facility for a total capacity of 85.8 MW. Diversion weirs in the river and tunneled penstocks will provide water to the turbines. It is intended to be operated as peaking plant about 3 hours daily. The p
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project is located about 40 kilometers east of La Paz on the Taquesi River and consists of two new run-of-river hydroelectric power plants in cascade (85 MW) and an existing refurbished 850-kW facility for a total capacity of 85.8 MW. Diversion weirs in the river and tunneled penstocks will provide water to the turbines. It is intended to be operated as peaking plant about 3 hours daily. The primary sponsors are Tenaska International (75%), International Mining Company S.A. (12.5%), a Bolivian mining company that operates mines in the area and own much (90%) of the land to be used for the project, and Hydro Power SFL (12.5%). The project company, Hidroelectrica Boliviana has had several technical studies performed, including a pre-feasibility study, a full EIA, a hydrology study and a market study. The company has received a local and federal environmental authorization to construct and operate the project. In Oct. 2000, the company received support from the USAID. Construction works are underway, and operation was expected to start in Jan. 2001. Electricity generated by the facility will supply the La Paz region power grid. None None |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
