logo
ProjectActive

Hidroelectrica Boliviana (Central Taquesi)

Active · La Paz

Source: World Bank Group

The project is located about 40 kilometers east of La Paz on the Taquesi River and consists of two new run-of-river hydroelectric power plants in cascade (85 MW) and an existing refurbished 850-kW facility for a total capacity of 85.8 MW. Diversion weirs in the river and tunneled penstocks will provide water to the turbines. It is intended to be operated as peaking plant about 3 hours daily. The p

Status
Prospective
Sector
Hydro, Wind, Power Generation (CCGT), Tunnel, Water Supply and Storage, Government
Location
La Paz, Bolivia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Hidroelectrica Boliviana (Central Taquesi)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Hidroelectrica Boliviana (Central Taquesi)” is an infrastructure initiative in the Hydro sector, located in La Paz, Bolivia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is located about 40 kilometers east of La Paz on the Taquesi River and consists of two new run-of-river hydroelectric power plants in cascade (85 MW) and an existing refurbished 850-kW facility for a total capacity of 85.8 MW. Diversion weirs in the river and tunneled penstocks will provide water to the turbines. It is intended to be operated as peaking plant about 3 hours daily. The primary sponsors are Tenaska International (75%), International Mining Company S.A. (12.5%), a Bolivian mining company that operates mines in the area and own much (90%) of the land to be used for the project, and Hydro Power SFL (12.5%). The project company, Hidroelectrica Boliviana has had several technical studies performed, including a pre-feasibility study, a full EIA, a hydrology study and a market study. The company has received a local and federal environmental authorization to construct and operate the project. In Oct. 2000, the company received support from the USAID. Construction works are underway, and operation was expected to start in Jan. 2001. Electricity generated by the facility will supply the La Paz region power grid. None None

Original sector

Energy

Budget

Location

Country

Bolivia

State

La Paz

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Generation (CCGT), Tunnel, Water Supply and Storage, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project