logo

Hidroelectrica Santa Cruz Small Hydro Power Plants

Sector: Hydro • Location: Peru

Source: World Bank Group

Project
Active

Hidroelectrica Santa Cruz, a partnership of the Peruvian company GCZ Ingenieros (76%) and Latin America Power (24%), was granted the right to build and operate four small hydro power plants located in the Blanco River and Huasahuasi River, provinces of Caraz and Tarma, respectively.

The first two small hydro power plants, Central Hidroelectrica Santa Cruz I and Central Hidroelectrica Santa Cru

Project Information FAQ

Project Information

4 Q
The project “Hidroelectrica Santa Cruz Small Hydro Power Plants” is an infrastructure initiative in the Hydro sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Hidroelectrica Santa Cruz, a partnership of the Peruvian company GCZ Ingenieros (76%) and Latin America Power (24%), was granted the right to build and operate four small hydro power plants located in the Blanco River and Huasahuasi River, provinces of Caraz and Tarma, respectively. The first two small hydro power plants, Central Hidroelectrica Santa Cruz I and Central Hidroelectrica Santa Cruz II had a capacity of 3 MW each and were located at the Blanco River. Central Hidroelectrica Santa Cruz I commenced operations in May 2009 and demanded US$ 6.5 million in investment. Central Hidroelectrica Santa Cruz II, which applied for carbon credits in 2009, started operating in May 2010 (investment figures on this project was not available). In March 2010, Hidroelectrica Santa Cruz was granted the right to build and operate the power plants Central Hidroelectrica Huasahuasi I (10 MW) and Central Hidroelectrica Huasahuasi II (10 MW) located at the Huasahuasi River. The sponsor committed to invest US$ 17.4 million in the construction of the Central Hidroelectrica Huasahuasi I, which became operational in January 2012. The investment in Central Hidroelectrica Huasahuasi II was estimated at US$ 14.5 million, and the power plant commenced operations in April 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data