Hidronihuil S.A.
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
Hidronihuil was awarded a 16-year contract to build and operate a hydroelectric power plant on the Atuel River. This is the fourth hydro power plant to be constructed on this river (the other three plants have been operated by Los Nihuiles S.A. The 30 MW power plant will supply electricity to Energia Mendoza Sociedad del Estado (EMSE), the state-owned electricity company of the Mendoza Province. T
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Hydro, Power Generation (CCGT), Government
- Location
- Mendoza, Argentina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Hidronihuil S.A.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hidronihuil was awarded a 16-year contract to build and operate a hydroelectric power plant on the Atuel River. This is the fourth hydro power plant to be constructed on this river (the other three plants have been operated by Los Nihuiles S.A. The 30 MW power plant will supply electricity to Energia Mendoza Sociedad del Estado (EMSE), the state-owned electricity company of the Mendoza Province. The payment will be based on the electricity generation; however, a minimum monthly payments is guaranteed in case of unavailability of water or no electricity purchase by EMSE. Hidronihuil is owned by Cartellone (75%) and Federacion Electrica de Nuevo Cuyo (25%). Financial closure was achieved in mid-1997, with a loan package approved by the IAIC: US$ 10 million direct loan and US$ 10 million syndicated loan (Dresdner Bank). The remaining costs of the US$ 35.7 million project will be financed with the sponsors' equity investment (US$ 9.8 million), suppliers credits (US$ 3.9 million) and a commercial bank loan (US$ 2 million). None None |
Original sector | Energy |
Budget |
Location
Country | Argentina |
State | Mendoza |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Hydro, Power Generation (CCGT), Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
