logo

Hidrosanbartolo, S.A.

Sector: Power Generation (CCGT) • Location: Ecuador

Source: Inter-American Development Bank (IADB)

Project
Repaid

The IIC loan would comprise an A loan for up to US$12.5 million and a B loan of up to US$17.4 million, for a total of up to US$29.9 million. The loan would provide Hidrosanbartolo S.A. with the financing it needs to design, build, and operate a run-of-the-river hydroelectric plant on the Río Negro River, which is part of the Namangoza Santiago hydrographic basin, located in the southeastern Ecuado

Project Information FAQ

Project Information

4 Q
The project “Hidrosanbartolo, S.A.” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ecuador. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaid

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The IIC loan would comprise an A loan for up to US$12.5 million and a B loan of up to US$17.4 million, for a total of up to US$29.9 million. The loan would provide Hidrosanbartolo S.A. with the financing it needs to design, build, and operate a run-of-the-river hydroelectric plant on the Río Negro River, which is part of the Namangoza Santiago hydrographic basin, located in the southeastern Ecuadorian province of Morona-Santiago.The Hidrosanbartolo S.A. project encompasses a run-of-the-river hydroelectric generating plant with approximately 48.07 megawatts (MW) of output, capable of generating some 350 gigawatts (GW) per year and a plant factor of 83.25%. The main components of the project include a low-level diversion weir, intake structure, steel pipe conveyance, penstock, surface power station, transmission line, and power substation. The project length is 5,500 meters to maintain a net head of 183 meters.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data