logo

High-Capacity Data Center Project in Kazakhstan

Sector: Power Generation (CCGT) • Location: Kazakhstan

Source: The Times Of Central Asia

Project
Planned

An international consortium including Dornan Engineering Group and JMOT04 will develop a major high-capacity data center in Kazakhstan. The project involves constructing a Tier III–Tier IV data center with a planned capacity ranging from 50 MW to 200 MW, with an investment estimated between $1 billion and $1.5 billion. Additionally, a gas-fired power plant with up to 250 MW capacity will be built

Status
Prospective
Sector
Power Generation (CCGT), Data Center
Location
Kazakhstan
Updated
22 Jul 2026
Source
The Times Of Central Asia

ConstructChat

Ask ConstructChat about High-Capacity Data Center Project in Kazakhstan

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “High-Capacity Data Center Project in Kazakhstan” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kazakhstan. Taiyo aggregates data on it from The Times Of Central Asia.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

An international consortium including Dornan Engineering Group and JMOT04 will develop a major high-capacity data center in Kazakhstan. The project involves constructing a Tier III–Tier IV data center with a planned capacity ranging from 50 MW to 200 MW, with an investment estimated between $1 billion and $1.5 billion. Additionally, a gas-fired power plant with up to 250 MW capacity will be built to ensure stable power supply, with an investment between $200 million and $400 million. The project will be implemented by Ample Solution Limited.

Original sector

Digital Infrastructure

Budget

Location

Country

Kazakhstan

Source

Source

The Times Of Central Asia

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project