logo

High Efficiency Ice Plant Upgrade

Sector: Stadium • Location: Woodstock, New Brunswick, Canada

Source: Dodge USA

Project
Start

Work in this section includes, but is not limited to, the supply and installation of equipment and labour required to automatically operate, monitor, report and alarm for the ice arena equipment, pumps, and refrigeration equipment for this project. This includes integration and support for interconnection with/between existing BAS and new ice plant complete with electrical wiring and control, cond

Status
Under Construction
Sector
Stadium, Power Generation (CCGT), Government, Car parking, Automotive, Commercial
Location
Woodstock, New Brunswick, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about High Efficiency Ice Plant Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “High Efficiency Ice Plant Upgrade” is an infrastructure initiative in the Stadium sector, located in Woodstock, New Brunswick, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work in this section includes, but is not limited to, the supply and installation of equipment and labour required to automatically operate, monitor, report and alarm for the ice arena equipment, pumps, and refrigeration equipment for this project. This includes integration and support for interconnection with/between existing BAS and new ice plant complete with electrical wiring and control, conduits, terminations, calibration, testing, and commissioning.

Procurement method

Location

Country

Canada

State

New Brunswick

City

Woodstock

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Stadium, Power Generation (CCGT), Government, Car parking, Automotive, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project