High-Level Bridge over Sukhna Choe
Sector: Bridge • Location: Chandigarh, India
Source: :: India News Calling ::
Construction of a high-level bridge over Sukhna Choe to connect Manimajra and Sector-26, aimed at providing uninterrupted all-weather connectivity, reducing travel time, enhancing commuter safety, and improving traffic flow. The bridge will have dual four-lane carriageways, footpaths, and cycle tracks, using advanced RCC and precast construction technology with flood-resilient measures.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction of a high-level bridge over Sukhna Choe to connect Manimajra and Sector-26, aimed at providing uninterrupted all-weather connectivity, reducing travel time, enhancing commuter safety, and improving traffic flow. The bridge will have dual four-lane carriageways, footpaths, and cycle tracks, using advanced RCC and precast construction technology with flood-resilient measures. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
