High Level Bridge Replacement
The owner, status and timeline of this project. A free account opens every field.
Source: Edmonton Journal
The project involves replacing the 113-year-old High Level Bridge in Edmonton, which is a designated historical resource and has reached the end of its life. The replacement bridge is planned to accommodate multiple modes of transportation including vehicle lanes, dedicated bus rapid transit lanes, multi-use paths, streetcar connection, and potentially high-speed rail to connect to Edmonton Intern
- Status
- Prospective
- Sector
- Cable car, Airport, Bridge, Rail, Automotive, Road
- Location
- Edmonton, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Edmonton Journal
ConstructChat
Ask ConstructChat about High Level Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing the 113-year-old High Level Bridge in Edmonton, which is a designated historical resource and has reached the end of its life. The replacement bridge is planned to accommodate multiple modes of transportation including vehicle lanes, dedicated bus rapid transit lanes, multi-use paths, streetcar connection, and potentially high-speed rail to connect to Edmonton International Airport. Planning and design are set to start in 2031 with full replacement completion by 2042. The city is also considering ways to honor the bridge's historic significance in the new design. |
Original sector | Transportation |
Location
Country | Canada |
State | Alberta |
City | Edmonton |
Source
Source | Edmonton Journal |
URL |
More Details
Record type | Project |
Sector | Cable car, Airport, Bridge, Rail, Automotive, Road |
Article published date | 2026-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
