logo
ProjectPlanned

High School Floor Tile Replacement

Planned · Missouri · Last reported Jul 2026

Source: Nevada Daily Mail

Replacement of floor tiles in the main lobby of the high school due to damage caused by a senior prank involving baby oil. The repair will cover the affected area with new tiles, starting Monday, with an estimated cost of about $3,000.

Status
Prospective
Sector
Education, Oil and Gas, Commercial
Location
Nevada, Missouri, United States of America
Updated
19 Nov 2026
Source
Nevada Daily Mail

ConstructChat

Ask ConstructChat about High School Floor Tile Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “High School Floor Tile Replacement” is an infrastructure initiative in the Education sector, located in Nevada, Missouri, United States. Taiyo aggregates data on it from Nevada Daily Mail.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Replacement of floor tiles in the main lobby of the high school due to damage caused by a senior prank involving baby oil. The repair will cover the affected area with new tiles, starting Monday, with an estimated cost of about $3,000.

Original sector

Education

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Nevada

Source

Source

Nevada Daily Mail

URL

More Details

Record type

Project

Sector

Education, Oil and Gas, Commercial

Article published date

2026-07-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project