High School Football Field Renovation
Sector: Commercial • Location: Fowlerville, Michigan, United States of America
Source: Dodge
The contractor is responsible for the following: 1. Field Preparation: Strip and remove all existing grass, weeds, and debris from the practice football field. Properly dispose of removed material. 2. Soil Preparation: Supply and install a minimum of 2 inches of premium topsoil across the entire field. Ensure the topsoil is installed according to the existing grades and slopes of the field. Ensure
- Status
- Closed
- Sector
- Commercial, Car parking, Education, Government, Automotive
- Location
- Fowlerville, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about High School Football Field Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contractor is responsible for the following: 1. Field Preparation: Strip and remove all existing grass, weeds, and debris from the practice football field. Properly dispose of removed material. 2. Soil Preparation: Supply and install a minimum of 2 inches of premium topsoil across the entire field. Ensure the topsoil is installed according to the existing grades and slopes of the field. Ensure the root zone is not compacted and is well-prepared for sod installation. 3. Sod Installation: I... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Fowlerville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Education, Government, Automotive |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
