High-Span Berbice River Bridge
The status, timeline and source of this project. A free account opens every field.
Source: Stabroek News
The project involves the construction of a new fixed high-span four-lane bridge across the Berbice River, aimed at enhancing transportation infrastructure and economic connectivity in Guyana. Seven international contractors have been shortlisted to submit price proposals for the project, which will replace the existing floating bridge.
- Status
- Prospective
- Sector
- Bridge, Road
- Location
- Guyana
- Updated
- 22 Jul 2026
- Source
- Stabroek News
ConstructChat
Ask ConstructChat about High-Span Berbice River Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of a new fixed high-span four-lane bridge across the Berbice River, aimed at enhancing transportation infrastructure and economic connectivity in Guyana. Seven international contractors have been shortlisted to submit price proposals for the project, which will replace the existing floating bridge. |
Original sector | Transportation |
Location
Country | Guyana |
Source
Source | Stabroek News |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
