High-Strength Cast Iron Pipe Plant in Saudi Arabia
Sector: Metal • Location: Saudi Arabia
Source: GMK Center
Jindal SAW, through its subsidiary Jindal Saw Holdings FZE, plans to build a plant for the production of high-strength cast iron pipes in Saudi Arabia in a joint venture with RAX United Industrial Company. Jindal will hold a 51% stake with investment commitments up to $3 million. The project is expected to be completed in 12-18 months.
- Status
- Prospective
- Sector
- Metal, Manufacturing (Industrial), Steel
- Location
- Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- GMK Center
ConstructChat
Ask ConstructChat about High-Strength Cast Iron Pipe Plant in Saudi Arabia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Jindal SAW, through its subsidiary Jindal Saw Holdings FZE, plans to build a plant for the production of high-strength cast iron pipes in Saudi Arabia in a joint venture with RAX United Industrial Company. Jindal will hold a 51% stake with investment commitments up to $3 million. The project is expected to be completed in 12-18 months. |
Original sector | Manufacturing |
Budget |
Location
Country | Saudi Arabia |
Source
Source | GMK Center |
URL |
More Details
Record type | Project |
Sector | Metal, Manufacturing (Industrial), Steel |
Article published date | 2025-06-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
