High-T at Paradise Road and Russell Road
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project is located at Harry Reid International Airport within the airport roadway system. The project will entail construction of a new High-T intersection at Paradise Road and Russell Road, installation of owner furnished traffic signals at two intersections, asphalt pavement reconstruction, concrete barrier rail, overhead traffic signage, storm drain piping and associated inlets, utility ad
- Status
- Closed
- Sector
- Broadband, Water Supply and Storage, Airport, Cement, Power Transmission, Rail, Road, Waste Processing and Treatment, Telecommunications, Power Generation (CCGT), Government, Commercial
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about High-T at Paradise Road and Russell Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is located at Harry Reid International Airport within the airport roadway system. The project will entail construction of a new High-T intersection at Paradise Road and Russell Road, installation of owner furnished traffic signals at two intersections, asphalt pavement reconstruction, concrete barrier rail, overhead traffic signage, storm drain piping and associated inlets, utility adjustments, ITS conduit and fiber optic lines to splice vaults, striping and roadway signage, rese... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Water Supply and Storage, Airport, Cement, Power Transmission, Rail, Road, Waste Processing and Treatment, Telecommunications, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
