High-Tech Interconnect Project (HIP)
Planned · Arizona · Last reported Mar 2025
Source: City of Chandler
The High-Tech Interconnect Project (HIP) is a proposed transmission project by SRP aimed at providing reliable power to the $20 billion expansion of Intel’s campus in Chandler. The project involves undergrounding a significant portion of the transmission line to minimize impact on local residents and businesses while addressing existing utility conflicts.
- Status
- Prospective
- Sector
- Government, Power Generation (CCGT), Power Transmission
- Location
- Chandler, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- City of Chandler
ConstructChat
Ask ConstructChat about High-Tech Interconnect Project (HIP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The High-Tech Interconnect Project (HIP) is a proposed transmission project by SRP aimed at providing reliable power to the $20 billion expansion of Intel’s campus in Chandler. The project involves undergrounding a significant portion of the transmission line to minimize impact on local residents and businesses while addressing existing utility conflicts. |
Location
Country | United States of America (USA) |
State | Arizona |
City | Chandler |
Source
Source | City of Chandler |
URL |
More Details
Record type | Project |
Sector | Government, Power Generation (CCGT), Power Transmission |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
