logo

High Transmission Beam Line at FRIB

One of 10,000+ projects Taiyo tracks in Michigan.

Source: Newswise

Project
Under Construction

The U.S. Department of Energy has approved the execution of a $49.7 million project for the High Transmission Beam Line at the Facility for Rare Isotope Beams (FRIB). This project is part of the High Rigidity Spectrometer initiative, aimed at enhancing scientific research capabilities for neutron-rich isotopes.

Status
Under Construction
Sector
Education
Location
East Lansing, Michigan, United States of America
Updated
22 Jul 2026
Source
Newswise

ConstructChat

Ask ConstructChat about High Transmission Beam Line at FRIB

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “High Transmission Beam Line at FRIB” is an infrastructure initiative in the Education sector, located in East Lansing, Michigan, United States. Taiyo aggregates data on it from Newswise.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The U.S. Department of Energy has approved the execution of a $49.7 million project for the High Transmission Beam Line at the Facility for Rare Isotope Beams (FRIB). This project is part of the High Rigidity Spectrometer initiative, aimed at enhancing scientific research capabilities for neutron-rich isotopes.

Budget

Location

Country

United States of America (USA)

State

Michigan

City

East Lansing

Source

Source

Newswise

URL

More Details

Record type

Project

Sector

Education

Article published date

2025-04-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project