High Transmission Beam Line at FRIB
One of 10,000+ projects Taiyo tracks in Michigan.
Source: Newswise
The U.S. Department of Energy has approved the execution of a $49.7 million project for the High Transmission Beam Line at the Facility for Rare Isotope Beams (FRIB). This project is part of the High Rigidity Spectrometer initiative, aimed at enhancing scientific research capabilities for neutron-rich isotopes.
- Status
- Under Construction
- Sector
- Education
- Location
- East Lansing, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Newswise
ConstructChat
Ask ConstructChat about High Transmission Beam Line at FRIB
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The U.S. Department of Energy has approved the execution of a $49.7 million project for the High Transmission Beam Line at the Facility for Rare Isotope Beams (FRIB). This project is part of the High Rigidity Spectrometer initiative, aimed at enhancing scientific research capabilities for neutron-rich isotopes. |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | East Lansing |
Source
Source | Newswise |
URL |
More Details
Record type | Project |
Sector | Education |
Article published date | 2025-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
