logo

Highbury Circle Reconstruction

Sector: Water Supply and Storage • Location: Platteville, Wisconsin, United States of America

Source: Dodge USA

Project
Pre-Design

Replacement of Highbury Circle from Knollwood Way to the cul-de-sac (634 feet). This will replace the failing asphalt street from Knollwood Way to the cul-de-sac. It will replace the underground utilities (water and storm sewer) and install conduit for future fiber optics. This street has numerous water main breaks. This project will install a new 8" water main. Road may be narrowed to reduce park

Status
Prospective
Sector
Water Supply and Storage, Car parking, Broadband, Automotive, Road, Power Transmission, Government, Telecommunications, Commercial, Power Generation (CCGT), Waste Processing and Treatment
Location
Platteville, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Highbury Circle Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Highbury Circle Reconstruction” is an infrastructure initiative in the Water Supply and Storage sector, located in Platteville, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of Highbury Circle from Knollwood Way to the cul-de-sac (634 feet). This will replace the failing asphalt street from Knollwood Way to the cul-de-sac. It will replace the underground utilities (water and storm sewer) and install conduit for future fiber optics. This street has numerous water main breaks. This project will install a new 8" water main. Road may be narrowed to reduce parking and slow traffic.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Platteville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Broadband, Automotive, Road, Power Transmission, Government, Telecommunications, Commercial, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2025-01-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project