Highgate Road Cluster Pipeline Replacement

Sector: Water Supply and Storage • Location: Kensington, California, United States of America

Source: East Bay Municipal Utility District

Project
Completed

Project Update: We are pleased to share that the Highgate Road Cluster Pipeline Replacement project has been completed. The last phase of this project will be the paving. The paving is planned for the Spring of 2023 when weather conditions are stable. Notices will be sent out to residents in the area when the paving is scheduled. Project details: Beginning February 2022, EBMUD crews will install

Project Information FAQ

Project Information

4 Q
The project “Highgate Road Cluster Pipeline Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Kensington, California, United States of America. Taiyo aggregates data on it from East Bay Municipal Utility District.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project Update: We are pleased to share that the Highgate Road Cluster Pipeline Replacement project has been completed. The last phase of this project will be the paving. The paving is planned for the Spring of 2023 when weather conditions are stable. Notices will be sent out to residents in the area when the paving is scheduled. Project details: Beginning February 2022, EBMUD crews will install a new water pipeline to improve water service in your Kensington neighborhood. We will work on: • Sunset Drive between Franciscan Way & Arlington Avenue • Highgate Road between Sunset Drive & Edwin Drive • Highgate Court We expect to complete pipeline installation in the Fall of 2022, with final paving to follow. Schedule: Work hours are 7 a.m. to 4:30 p.m., Monday through Friday. We will provide traffic control. Residents may experience delays of up to 10 minutes when entering and leaving the work area. If you have special needs, please call us and we will make every effort to accommodate. : What to expect : • Equipment and materials will be temporarily located in your neighborhood during construction. • After the new water pipeline is installed, crews will transfer water services, install fire hydrants and make final connections. • Once construction is completed, material and equipment will be removed within 1 to 2 weeks. Water service interruption : Crews will notify you with a door hanger regarding planned water service interruption to your property. After a service interruption, there may be air in the pipes that may loosen particles in your home plumbing. Close your toilet water supply valves, and then run water from your front hose bib, bathtub and/or cold water faucets for 1-3 minutes. This will dispel any air or loosened particles from your household pipes. If any water quality issues remain after flushing, please call us. Paving: The asphalt paving applied daily is temporary and is designed to provide a safe road surface during construction. Final paving occurs after pipeline work is completed. It may take up to 90 days or longer before final paving is completed. Watch a video on how EBMUD paves streets following pipe replacements. Flushing for water quality : After pipe installations or repairs, EBMUD crews may flush water lines with large volumes of water to ensure water is clean and safe. When crews flush pipes, customers may see water discharged into tanks or storm drains. Flushing is a critical step to keep your water safe by removing sediment and discolored water following a repair or new pipe install. EBMUD values conservation and water reuse, especially during drought, and works to reuse flushed water whenever possible. Learn more. Frequently asked questions : What impacts are expected when pipelines are installed? What work is happening near you? Use our map. What is EBMUD's plan to replace pipelines?

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data