logo
ProjectClosed

Highland Ave Sidewalk

One of 10,000+ projects Taiyo tracks in New Jersey.

Source: Dodge

Description: Under this item, the Contractor shall furnish all labor, materials, equipment, etc., and construct complete sidewalk and driveway aprons as shown on plans and specified herein or as directed by the Public Works Manager. This work shall also consist of construction of ADA compliant handicap ramps with truncated domes inlaid in concrete. Care should be taken when excavating and during p

Status
Closed
Sector
Power Transmission, Road, Commercial, Car parking, Cement, Government, Power Generation (CCGT), Automotive
Location
Franklin Township, New Jersey, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Highland Ave Sidewalk

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Highland Ave Sidewalk” is an infrastructure initiative in the Power Transmission sector, located in Franklin Township, New Jersey, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Description: Under this item, the Contractor shall furnish all labor, materials, equipment, etc., and construct complete sidewalk and driveway aprons as shown on plans and specified herein or as directed by the Public Works Manager. This work shall also consist of construction of ADA compliant handicap ramps with truncated domes inlaid in concrete. Care should be taken when excavating and during placement of concrete to protect any utility services. Valve boxes and or clean outs should be rai...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Jersey

City

Franklin Township

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Transmission, Road, Commercial, Car parking, Cement, Government, Power Generation (CCGT), Automotive

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project