Highland Drive Culvert Replacement
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Dodge USA
Project involves removing existing buried reinforced concrete box culvert and corrugated metal pipe extensions and replacing them with 76 linear feet of 36" RCP including erosion control, traffic control, detour, bypassing running water, tree removal, sanitary sewer and lateral spot repairs, small diameter storm sewer replacement, storm manhole, grading, pavement replacement, modular block retaini
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Steel, Government, Commercial
- Location
- Elm Grove, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Highland Drive Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project involves removing existing buried reinforced concrete box culvert and corrugated metal pipe extensions and replacing them with 76 linear feet of 36" RCP including erosion control, traffic control, detour, bypassing running water, tree removal, sanitary sewer and lateral spot repairs, small diameter storm sewer replacement, storm manhole, grading, pavement replacement, modular block retaining walls, wood fencing, steel plate beam guard replacement, riprap, restoration of disturbed vege... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Elm Grove |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Steel, Government, Commercial |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
