Highland Gate Subdivision Resurfacing & Drainage Impt
Sector: Commercial • Location: Gainesville, Georgia, United States of America
Source: Dodge USA
Repair drainage on Highland Gate Parkway at the stream crossing and low point indicated on Sheet C-2. Furnish and install materials according to the specifications listed in Addendum 1 Plan set. Remove and dispose of broken sections of concrete sidewalks and curb and gutter that have been marked. Furnish and install 3,000psi concrete for all sidewalks and curb and gutter. Backfill with earth as ne
- Status
- Closed
- Sector
- Commercial, Cement, Water Supply and Storage, Waste Processing and Treatment, Car parking, Road, Automotive, Government, Raw Materials
- Location
- Gainesville, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Highland Gate Subdivision Resurfacing & Drainage Impt
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Repair drainage on Highland Gate Parkway at the stream crossing and low point indicated on Sheet C-2. Furnish and install materials according to the specifications listed in Addendum 1 Plan set. Remove and dispose of broken sections of concrete sidewalks and curb and gutter that have been marked. Furnish and install 3,000psi concrete for all sidewalks and curb and gutter. Backfill with earth as necessary. Full Depth Reclamation of Highland Gate Parkway, Yohah Park, Chicopee Overlook, Whitehal... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Gainesville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Water Supply and Storage, Waste Processing and Treatment, Car parking, Road, Automotive, Government, Raw Materials |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
