Highland St Tweedy St & Alley Utility Reconstruction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The work for which bids are asked includes the following estimated quantities: 320 LF of sanitary sewer force main (4-inch P.V.C.) along with associated sanitary sewer work; 1,600 L.F. of water main (8 PVC) along with associated water services; 130 LF of storm sewer (12-inch) and associated storm structure work; 3,000 S.Y. aggregate base installation; 3,000 S.Y. of asphalt pavement; as well as all
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Road, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Waste Processing and Treatment, Automotive
- Location
- Hustisford, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Highland St Tweedy St & Alley Utility Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work for which bids are asked includes the following estimated quantities: 320 LF of sanitary sewer force main (4-inch P.V.C.) along with associated sanitary sewer work; 1,600 L.F. of water main (8 PVC) along with associated water services; 130 LF of storm sewer (12-inch) and associated storm structure work; 3,000 S.Y. aggregate base installation; 3,000 S.Y. of asphalt pavement; as well as all related work including spot concrete curb repair, spot concrete sidewalk repair, spot concrete d... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Hustisford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Waste Processing and Treatment, Automotive |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
