HIGHLAND WTR.I
One of 739 projects Taiyo tracks in Lesotho.
Source: World Bank Group
The project is the phase 1A of a 30-year scheme to export water from Lesotho to the industrial heartland of the Republic of South Africa (RSA). It includes the following facilities to permit water transfer and install 72 MW capacity of hydropower: (i) a 182 meter-high concrete arch dam at Katse; (ii) 48 kms of tunnels to transfer the stored water from Katse to 'Muela; (iii) a 72 MW hydro power pla
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment, Hydro, Tunnel, Commercial, Government, Cement
- Location
- Lesotho
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about HIGHLAND WTR.I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is the phase 1A of a 30-year scheme to export water from Lesotho to the industrial heartland of the Republic of South Africa (RSA). It includes the following facilities to permit water transfer and install 72 MW capacity of hydropower: (i) a 182 meter-high concrete arch dam at Katse; (ii) 48 kms of tunnels to transfer the stored water from Katse to 'Muela; (iii) a 72 MW hydro power plant (with 120 km of transmission lines to Maseru) and a 55 meter-high concrete gravity arch dam at 'Muela; (iv) a 16 km delivery tunnel from 'Muela to the crossover point into RSA; and (v) 200 kms of access roads, including two bridges and other infrastructure facilities. The project also includes environmental protection measures, compensation and resettlement, construction supervision, technical assistance, road maintenance, improved border crossing facilities and studies to prepare the next phase (1B) of the scheme. An important element of the project is the creation of a development fund for channelling project revenues (royalties and other project related payments) to development-oriented programs. |
Original sector | Energy and Extractives,FY17 - Public Administration,FY17 - Social Protection,FY17 - Water, Sanitation and Waste Management,Transportation |
Budget |
Location
Country | Lesotho |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment, Hydro, Tunnel, Commercial, Government, Cement |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
