logo

HIGHLAND WTR.I

Sector: Road • Location: Lesotho

Source: World Bank Group

Project
Closed

The project is the phase 1A of a 30-year scheme to export water from Lesotho to the industrial heartland of the Republic of South Africa (RSA). It includes the following facilities to permit water transfer and install 72 MW capacity of hydropower: (i) a 182 meter-high concrete arch dam at Katse; (ii) 48 kms of tunnels to transfer the stored water from Katse to 'Muela; (iii) a 72 MW hydro power pla

Project Information FAQ

Project Information

5 Q
The project “HIGHLAND WTR.I” is an infrastructure initiative in the Road sector, located in Lesotho. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is the phase 1A of a 30-year scheme to export water from Lesotho to the industrial heartland of the Republic of South Africa (RSA). It includes the following facilities to permit water transfer and install 72 MW capacity of hydropower: (i) a 182 meter-high concrete arch dam at Katse; (ii) 48 kms of tunnels to transfer the stored water from Katse to 'Muela; (iii) a 72 MW hydro power plant (with 120 km of transmission lines to Maseru) and a 55 meter-high concrete gravity arch dam at 'Muela; (iv) a 16 km delivery tunnel from 'Muela to the crossover point into RSA; and (v) 200 kms of access roads, including two bridges and other infrastructure facilities. The project also includes environmental protection measures, compensation and resettlement, construction supervision, technical assistance, road maintenance, improved border crossing facilities and studies to prepare the next phase (1B) of the scheme. An important element of the project is the creation of a development fund for channelling project revenues (royalties and other project related payments) to development-oriented programs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data