logo
ProjectClosed

HIGHLAND WTR.I

One of 739 projects Taiyo tracks in Lesotho.

Source: World Bank Group

The project is the phase 1A of a 30-year scheme to export water from Lesotho to the industrial heartland of the Republic of South Africa (RSA). It includes the following facilities to permit water transfer and install 72 MW capacity of hydropower: (i) a 182 meter-high concrete arch dam at Katse; (ii) 48 kms of tunnels to transfer the stored water from Katse to 'Muela; (iii) a 72 MW hydro power pla

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment, Hydro, Tunnel, Commercial, Government, Cement
Location
Lesotho
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about HIGHLAND WTR.I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “HIGHLAND WTR.I” is an infrastructure initiative in the Road sector, located in Lesotho. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is the phase 1A of a 30-year scheme to export water from Lesotho to the industrial heartland of the Republic of South Africa (RSA). It includes the following facilities to permit water transfer and install 72 MW capacity of hydropower: (i) a 182 meter-high concrete arch dam at Katse; (ii) 48 kms of tunnels to transfer the stored water from Katse to 'Muela; (iii) a 72 MW hydro power plant (with 120 km of transmission lines to Maseru) and a 55 meter-high concrete gravity arch dam at 'Muela; (iv) a 16 km delivery tunnel from 'Muela to the crossover point into RSA; and (v) 200 kms of access roads, including two bridges and other infrastructure facilities. The project also includes environmental protection measures, compensation and resettlement, construction supervision, technical assistance, road maintenance, improved border crossing facilities and studies to prepare the next phase (1B) of the scheme. An important element of the project is the creation of a development fund for channelling project revenues (royalties and other project related payments) to development-oriented programs.

Original sector

Energy and Extractives,FY17 - Public Administration,FY17 - Social Protection,FY17 - Water, Sanitation and Waste Management,Transportation

Budget

Location

Country

Lesotho

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment, Hydro, Tunnel, Commercial, Government, Cement

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project