logo
ProjectClosed

Highway 10 Bypass Utility Relocation

One of 10,000+ projects Taiyo tracks in Arkansas.

Source: Dodge

The project consists of the relocation of 12-inch, 8-inch, and 6-inch diameter potable water lines, valves, fire hydrants, and appurtenances. The project also includes the installation of 12-inch and 16-inch diameter sanitary sewer force mains through existing encasement pipes as well as the relocation of gravity sewer lines and manholes to facilitate the construction of the Highway 59 Realignment

Status
Closed
Sector
Water Supply and Storage, Government, Power Transmission, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road
Location
Greenwood, Arkansas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Highway 10 Bypass Utility Relocation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Highway 10 Bypass Utility Relocation” is an infrastructure initiative in the Water Supply and Storage sector, located in Greenwood, Arkansas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the relocation of 12-inch, 8-inch, and 6-inch diameter potable water lines, valves, fire hydrants, and appurtenances. The project also includes the installation of 12-inch and 16-inch diameter sanitary sewer force mains through existing encasement pipes as well as the relocation of gravity sewer lines and manholes to facilitate the construction of the Highway 59 Realignment Improvements

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arkansas

City

Greenwood

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Power Transmission, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project