logo

Highway 101 San Miguel Rehabilitation Project

Sector: Bridge • Location: California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Ongoing

This project will rehabilitate and upgrade eight miles of U.S. Highway 101 from just south of San Marcos Creek Bridge in San Luis Obispo County to just south of the East Garrison overcrossing in Monterey County. During construction of this project, bicycle traffic will be detoured while the highway is temporarily closed to bicycles. The temporary closure to bicyclists is necessary for safety given

Project Information FAQ

Project Information

4 Q
The project “Highway 101 San Miguel Rehabilitation Project” is an infrastructure initiative in the Bridge sector, located in California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project will rehabilitate and upgrade eight miles of U.S. Highway 101 from just south of San Marcos Creek Bridge in San Luis Obispo County to just south of the East Garrison overcrossing in Monterey County. During construction of this project, bicycle traffic will be detoured while the highway is temporarily closed to bicycles. The temporary closure to bicyclists is necessary for safety given the high speed vehicular traffic, the reduction of available travel lanes from two to one in each direction, presence of narrow bridges, the reduction of shoulder widths due to temporary concrete barriers, and crossover detouring of traffic in both directions. The purpose of the project is to prevent further deterioration of the pavement and reduce the cost of future maintenance, while upgrading the facility to current Caltrans standards.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data