Highway 11 Reconstruction Project - Phase 2

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The Highway 11 reconstruction project consists of adding a lane of traffic to the existing two lane configuration, the full reconstruction of sanitary sewer system, water distribution system and storm system. All service to properties will be upgraded to current standards and enlarged to accommodate current demand. We will reverse the grade on the sanitary line to allow for the Phase 3 to commence

Project Information FAQ

Project Information

5 Q
The project “Highway 11 Reconstruction Project - Phase 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Highway 11 reconstruction project consists of adding a lane of traffic to the existing two lane configuration, the full reconstruction of sanitary sewer system, water distribution system and storm system. All service to properties will be upgraded to current standards and enlarged to accommodate current demand. We will reverse the grade on the sanitary line to allow for the Phase 3 to commence. The Phase 3 will involve removing a lift station and considerable bypassing. Addition to this is the replacement of all curbs and sidewalks in the area providing safer pedestrian utilization, adding a bicycle path on the south side to promote healthy community living for summer utilization and snowmobiles for winter utilization. The road will be excavated to 750 mm and the substandard material will be replaced with final step being paving of the Connecting Link.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data