Highway 146 Bridge Project
Under construction · Texas · Last reported May 2025
Source: Baytown Sun
The Highway 146 bridge project near Ferry Road aims to improve mobility by constructing four lanes within the existing right-of-way over a distance of about 1.45 miles. The project is expected to enhance traffic flow and accessibility in the area.
- Status
- Under Construction
- Sector
- Road, Bridge
- Location
- Baytown, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Baytown Sun
ConstructChat
Ask ConstructChat about Highway 146 Bridge Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Highway 146 bridge project near Ferry Road aims to improve mobility by constructing four lanes within the existing right-of-way over a distance of about 1.45 miles. The project is expected to enhance traffic flow and accessibility in the area. |
Location
Country | United States of America (USA) |
State | Texas |
City | Baytown |
Source
Source | Baytown Sun |
URL |
More Details
Record type | Project |
Sector | Road, Bridge |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
