Highway 151 Intersection Project
Sector: Road • Location: Beaver Dam, Wisconsin, United States
Source: Daily Dodge
The project involves changes to two intersections along Highway 151 in Dodge County, including the intersection of Highway C in the town of Trenton and the intersection of Highway DE and Jackson Road south of Beaver Dam. The redesign will implement R-CUTs, requiring drivers to make right turns and use the median to turn around.
- Status
- Under Construction
- Sector
- Road, Hydro, Water Supply and Storage
- Location
- Beaver Dam, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Daily Dodge
ConstructChat
Ask ConstructChat about Highway 151 Intersection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves changes to two intersections along Highway 151 in Dodge County, including the intersection of Highway C in the town of Trenton and the intersection of Highway DE and Jackson Road south of Beaver Dam. The redesign will implement R-CUTs, requiring drivers to make right turns and use the median to turn around. |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Beaver Dam |
Source
Source | Daily Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Hydro, Water Supply and Storage |
Article published date | 2025-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
