Highway 179 Bypass Trail Improvements
Sector: Water Supply and Storage • Location: Jefferson City, Missouri, United States of America
Source: Dodge USA
The proposed work includes: the furnishing of all material, labor, and equipment to construct a 10-footwide concrete trail along the Frog Hollow Branch of Wears Creek from Cavalier Drive to W. Edgewood Drive and a crosswalk at W. Edgewood Drive, including concrete trail and sidewalk, curb and gutter, streambank stabilization, stormwater structures and piping, retaining walls, pedestrian warning li
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Road, Mass Transit, Government, Rail, Car parking, Automotive, Cement, Waste Processing and Treatment
- Location
- Jefferson City, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Highway 179 Bypass Trail Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work includes: the furnishing of all material, labor, and equipment to construct a 10-footwide concrete trail along the Frog Hollow Branch of Wears Creek from Cavalier Drive to W. Edgewood Drive and a crosswalk at W. Edgewood Drive, including concrete trail and sidewalk, curb and gutter, streambank stabilization, stormwater structures and piping, retaining walls, pedestrian warning lights, signage, striping and other ancillary construction. The project will also include the const... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Jefferson City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Mass Transit, Government, Rail, Car parking, Automotive, Cement, Waste Processing and Treatment |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
