Highway 2 Fall River Drainage Systems Upgrades Project
Sector: Waste Processing and Treatment • Location: Nova Scotia, Canada
Source: Infrastructure Canada
The project will upsize the existing stormwater piping of the Highway 2 drainage system to accommodate stormwater flows and mitigate flooding during heavy rainfall events. Once completed, the project will reduce the risk of flooding to private property, residences and the highway corridor.
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Government
- Location
- Nova Scotia, Canada
- Updated
- 19 Nov 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Highway 2 Fall River Drainage Systems Upgrades Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project will upsize the existing stormwater piping of the Highway 2 drainage system to accommodate stormwater flows and mitigate flooding during heavy rainfall events. Once completed, the project will reduce the risk of flooding to private property, residences and the highway corridor. |
Original sector | Climate Resilience |
Location
Country | Canada |
State | Nova Scotia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Wood Buffalo Wastewater Treatment Plant
- Acden Corporate Headquarters and Fleet Facility
- Wastewater Treatment Lagoon and Collection System Improvements
- Elie Lagoon RipRap Upgrade
- Altona / Rhineland Waste Disposal Ground Expansion
- Treherne Water & Sewer Main Renewal
- Broadway and Mountain Backlane Sewer and Water Replacement Project
- Mountain Avenue and Broadway and Mountain Backlane Sewer and Water Replacement - Phase II
