logo

Highway 25 Widening

Sector: Road • Location: California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Proposed

The California Department of Transportation (Caltrans), in cooperation with the Council of San Benito County Governments and the Santa Clara Valley Transportation Authority, is proposing the eventual replacement of 11.2 miles of the existing State Route 25 two-lane highway with a four-lane expressway in San Benito and Santa Clara counties. A future interchange at State Route 25/State Route 156 wou

Project Information FAQ

Project Information

4 Q
The project “Highway 25 Widening” is an infrastructure initiative in the Road sector, located in California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The California Department of Transportation (Caltrans), in cooperation with the Council of San Benito County Governments and the Santa Clara Valley Transportation Authority, is proposing the eventual replacement of 11.2 miles of the existing State Route 25 two-lane highway with a four-lane expressway in San Benito and Santa Clara counties. A future interchange at State Route 25/State Route 156 would require widening State Route 156 between post miles R10.5 and R12.2. Caltrans is the lead agency for this project under the California Environmental Quality Act. The Final Environmental Impact Report (EIR), completed in June 2016 evaluated a proposed route adoption and includes a route adoption study (a broad Tier I environmental analysis). Three alternatives for the route adoption were under consideration: a No-Build Alternative and Alternatives 1 and 2. The Final EIR selected the Alternative 2 as the preferred alternative for route adoption. In October 2016, Caltrans submitted documentation to the California Transportation Commission for the route adoption of the preferred route adoption alignment, which was subsequently approved. A route adoption would require the City of Hollister, San Benito and Santa Clara counties to adopt a specific corridor for a future expressway into their General Plans. Both the City of Hollister and San Benito County have adopted the route adoptions, Santa Clara’s approval is pending. At some time in the future, most or all of the parcels within the defined area would eventually be acquired for the expressway. At this time there is not a build portion on this project. A new environmental document will be produced and circulated to the public if a build project is proposed in the future.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data