Highway 29 cross-border bridge

Sector: Cement • Location: Finland

Source: EU Funding & Tenders Portal

Project
Ongoing

The project is located on Highway 29 in the city of Tornio in Finland, on the TEN-T Core Network and part of both the Scandinavian-Mediterranean Corridor and the North Sea -Baltic Corridor. The objective of the project is to upgrade the road bridge crossing the river Tornio and leading to the Finnish-Swedish border. The project will improve the structural strength and load-bearing capacity for civ

Project Information FAQ

Project Information

4 Q
The project “Highway 29 cross-border bridge” is an infrastructure initiative in the Cement sector, located in Finland. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is located on Highway 29 in the city of Tornio in Finland, on the TEN-T Core Network and part of both the Scandinavian-Mediterranean Corridor and the North Sea -Baltic Corridor. The objective of the project is to upgrade the road bridge crossing the river Tornio and leading to the Finnish-Swedish border. The project will improve the structural strength and load-bearing capacity for civilian and military transport extending the bridge’s service life. It will also reduce cross-border traffic and noise pollution and enhance emergency preparedness and road safety. The project will comply with the dual-use road requirements (No 1-8) as defined in the Commission Implementing Regulation (EU) 2021/1328. The concrete deck of the bridge is damaged by the alkali-aggregate reaction. The old bridge deck will be replaced with a new deck with a composite structure. The intermediate supports and ground supports will be repaired. The railings will be upgraded to current standards, improving the bridge’s crash safety. The expansion joints will be replaced with quiet models, reducing noise pollution in the urban area. The total length of the bridge measures 318 meters with a total width of minimum 18,30 meters and a maximum width of 24,18 meters. The main objectives of the project are to remove a traffic bottleneck between Finland and Sweden and facilitate the security of the supply by improving Finland's main overland connection to Europe and the ports of Norway. In addition, the project will enable the development of the unique twin town TornioHaparanda located on the border between Finland and Sweden.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data