logo
ProjectClosed

Highway 371 Expansion, Minnesota, US

One of 10,000+ projects Taiyo tracks in United States.

Source: Road Traffic Technology

Construction on the Highway 371 expansion project began in April 2016. Credit: Minnesota Department of Transportation. The expansion project was completed in October 2017. Credit: Minnesota Department of Transportation. Construction of Paul Bunyan Trail bridge deck construction was completed in July 2016. Credit: Minnesota Department of Transportation. Paul Bunyan trail bridge truss sections were

Status
Closed
Sector
Bridge, Cement, Commercial, Manufacturing (Industrial), Steel, Road, Government
Location
United States of America
Updated
22 Jul 2026
Source
Road Traffic Technology

ConstructChat

Ask ConstructChat about Highway 371 Expansion, Minnesota, US

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Highway 371 Expansion, Minnesota, US” is an infrastructure initiative in the Bridge sector, located in United States. Taiyo aggregates data on it from Road Traffic Technology.

Participants

Sponsoring Agency

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction on the Highway 371 expansion project began in April 2016. Credit: Minnesota Department of Transportation. The expansion project was completed in October 2017. Credit: Minnesota Department of Transportation. Construction of Paul Bunyan Trail bridge deck construction was completed in July 2016. Credit: Minnesota Department of Transportation. Paul Bunyan trail bridge truss sections were delivered to the construction site in September 2016. Credit: Minnesota Department of Transportation. County Road 11 was opened for traffic in October 2016. Credit: Minnesota Department of Transportation. Located in central and north-central Minnesota, US, State Highway 371 links the state’s northern lakes region with the central region. The highway was expanded from two to four lanes from Nisswa to Jenkins to improve access along the corridor. The $49.8mexpansionwas undertaken by the Minnesota Department of Transportation (MnDOT). Construction on the project commenced in April 2016 and was completed in October 2017. The Highway 371 improvement project provides transportation system improvements to resolve critical travel safety, design deficiencies and capacity problems, as well as reduce congestion. The alternatives for Highway 371 improvement included no built, existing alignment, existing alignment with Pequot Lakes bypass, existing alignment with Pequot Lakes and Jenkins bypass, and existing alignment with Jenkins bypass. The existing alignment with Pequot Lakes was selected as the preferred alternative for the highway expansion. MnDOT completed the draft supplemental final environmental impact statement (SFEIS) for the alternative in February 2010. The SFEIS was completed in July 2010. Property acquisition for the project was completed between 2010 and 2015. Plans for the Highway 371 expansion between Nisswa and Jenkins were announced in October 2014 after obtaining $45m under the Corridors of Commerce funds. The project expanded a nine-mile (14.48km) section of Highway 371 between Nisswa and Jenkins to four lanes from the existing two lanes. The project also included the addition of road lanes and the construction of a new Cullen Brook bridge in the Nisswa region. In the Pequot Lakes region, the expansion involved the construction of two road lanes, in addition to realignment and the addition of easy access points to city roads. A new County Road (CR) 11 interchange with roundabouts was also constructed, as well as new road links at CR 168/107 and CR 112. Construction works in the Jenkins region involved a new signalised intersectionat CR 16/Meyers Road. The project also realigned the Paul Bunyan Trail and added a new trail bridge over the highway in Pequot Lakes. The pre-construction works, including soil testing and tree clearing along Cullen Brook in north Nisswa, were completed between December 2015 and April 2016. The ground-breaking ceremony for the expansion was held at Brainerd Lakes Chambers of Commerce in Pequot Lakes in April 2016. Earth-moving works on site began in July 2016. Construction of the Paul Bunyan Trailbridgedeck was completed in July 2016. The bridge truss sections for the Paul Bunyan trail bridge were delivered in September 2016. Construction works on the Paul Bunyan trail bridge were completed by October 2016. The concrete materials for the construction of CR 11 Bridge in Pequot Lakes were delivered in July 2016. Concrete pouring for the construction of interchanges abutment and piers began in the same month. Pre-fabricated concrete beams for the construction of the CR 11 Bridge were delivered in August 2016. Installation of reinforcement rebar for concrete deck pouring at CR 11 Bridge began in September 2016. Paving works for ramps and roundabouts for CR 11 were completed and the road was opened for traffic in October 2016. Mathiowetz Construction was awarded the $49.86m design-build contract for the expansion of Highway 371 in November 2015. WSB & Associates was contracted to provide engineering design services and design quality control oversight for the project in October 2015.

Original sector

Transportation

Procurement method

Budget

Location

Country

United States of America (USA)

Source

Source reliability

High

Source

Road Traffic Technology

URL

More Details

Record type

Project

Sector

Bridge, Cement, Commercial, Manufacturing (Industrial), Steel, Road, Government

Article published date

2023-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project