Highway 385 Construction and Rock Scaling Work
Sector: Hydro • Location: Rapid City, South Dakota, United States
Source: KOTA Territory News
Construction continues on U.S. Highway 385 between Pactola Dam and Calumet Road with gravel surfacing and rock scaling operations to remove loose rocks and debris from steep rock faces starting May 18. Traffic is controlled by flaggers and pilot cars with delays up to 15 minutes expected. Construction pauses for major events and holidays.
- Status
- Under Construction
- Sector
- Hydro, Road
- Location
- Rapid City, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- KOTA Territory News
ConstructChat
Ask ConstructChat about Highway 385 Construction and Rock Scaling Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction continues on U.S. Highway 385 between Pactola Dam and Calumet Road with gravel surfacing and rock scaling operations to remove loose rocks and debris from steep rock faces starting May 18. Traffic is controlled by flaggers and pilot cars with delays up to 15 minutes expected. Construction pauses for major events and holidays. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Rapid City |
Source
Source | KOTA Territory News |
URL |
More Details
Record type | Project |
Sector | Hydro, Road |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
