Highway 385 Improvement Project
Sector: Road • Location: Colorado, United States
Source: Colorado Department of Transportation (CDOT)
The project involves replacing a bridge and realigning a segment of US 385 between Grenada and Bristol. The highway will be shifted 35 feet east for 2.6 miles to provide a smoother alignment, and an old timber bridge will be replaced with a concrete box culvert to reduce flooding risks.
- Status
- Under Construction
- Sector
- Road, Cement, Bridge, Forest Products and Packaging, Government, Residential
- Location
- Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Colorado Department of Transportation (CDOT)
ConstructChat
Ask ConstructChat about Highway 385 Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing a bridge and realigning a segment of US 385 between Grenada and Bristol. The highway will be shifted 35 feet east for 2.6 miles to provide a smoother alignment, and an old timber bridge will be replaced with a concrete box culvert to reduce flooding risks. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
Source
Source | Colorado Department of Transportation (CDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Bridge, Forest Products and Packaging, Government, Residential |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
