Highway 4 St. James to Sleepy Eye Project

Sector: Bridge • Location: St. James to Sleepy Eye, Minnesota, United States of America (USA)

Source: Minnesota Department of Transportation (MnDOT)

Project
Ongoing

The Hwy 4 project between St. James and Sleepy Eye includes roadway, bridge, and drainage improvements. In addition to resurfacing approximately 25 miles of roadway, three bridges will be replaced. This project was previously planned for 2023 construction, but is now moving out at least one year. MnDOT has been working closely with both Brown County and Watonwan County to determine various needs o

Project Information FAQ

Project Information

4 Q
The project “Highway 4 St. James to Sleepy Eye Project” is an infrastructure initiative in the Bridge sector, located in St. James to Sleepy Eye, Minnesota, United States of America (USA). Taiyo aggregates data on it from Minnesota Department of Transportation (MnDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Hwy 4 project between St. James and Sleepy Eye includes roadway, bridge, and drainage improvements. In addition to resurfacing approximately 25 miles of roadway, three bridges will be replaced. This project was previously planned for 2023 construction, but is now moving out at least one year. MnDOT has been working closely with both Brown County and Watonwan County to determine various needs on Hwy 4, one of which is the desire by local partners to make it a 10-ton route. This would require not only a more significant pavement fix than originally planned, but potentially a grade raise to meet the designated weight limit standards. Balancing cost and pavement needs across the state highway system, MnDOT is looking closely at various alternatives and budgets to determine if the project will be able to achieve a 10-ton route. To address any pavement issues between now and construction, MnDOT staff will monitor and conduct maintenance as needed until a future project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data