logo

Highway 401 Project from County Road 28 to Hamilton Road

The owner, status and timeline of this project. A free account opens every field.

Source: Today's Northumberland

Project
Preliminary Design Completed, Environmental Assessment In Public Comment Period

The Ministry of Transportation (MTO) retained Egis-LEA Joint Venture to carry out the Preliminary Design and Class Environmental Assessment for Highway 401 from 500m west of Cranberry Road to 450m east of County Road 28, including several bridges and the County Road 28 interchange in Port Hope. The project is divided into two studies: Study #1 focused on structural needs of three bridges and estab

Status
Preliminary design completed, environmental assessment in public comment period
Sector
Road, Government
Location
Port Hope, Ontario, Canada
Updated
22 Jul 2026
Source
Today's Northumberland

ConstructChat

Ask ConstructChat about Highway 401 Project from County Road 28 to Hamilton Road

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Highway 401 Project from County Road 28 to Hamilton Road” is an infrastructure initiative in the Road sector, located in Port Hope, Ontario, Canada. Taiyo aggregates data on it from Today's Northumberland.

Participants

Sponsoring Agency

Status

Original status

preliminary design completed, environmental assessment in public comment period

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ministry of Transportation (MTO) retained Egis-LEA Joint Venture to carry out the Preliminary Design and Class Environmental Assessment for Highway 401 from 500m west of Cranberry Road to 450m east of County Road 28, including several bridges and the County Road 28 interchange in Port Hope. The project is divided into two studies: Study #1 focused on structural needs of three bridges and establishing the future footprint of Highway 401, completed with environmental clearance in 2022. Study #2 includes future operational long-term needs at the County Road 28 interchange and structural needs of two bridges, with Preliminary Design completed and a Transportation Environmental Study Report (TESR) prepared and available for public comment from November 3, 2025 to December 2, 2025.

Original sector

Transportation

Location

Country

Canada

State

Ontario

City

Port Hope

Source

Source

Today's Northumberland

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2025-11-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project